The objective of this project was to achieve stringent micro-bacteria criteria in the client’s finished product. This involved the design and installation of a new materials handling system, waste and hygiene management systems, and the refurbishment, extension and reconfiguration of existing process areas.
A new air management system was designed and installed to give state-of-the-art control over the process environment. The client’s production was maintained throughout the implementation of the project.